Rondo Energy, Inc.

Power & Grid
PrivateAlameda, CaliforniaFounded 2020rondo.com ↗

Alameda, California company that stores electricity as heat in refractory brick and discharges it as steam or hot air for industrial plants. It has three documented operating units, the largest a 100 MWh system making steam for enhanced oil recovery in Kern County, and has published no operating data for any of them.

Announced equity
$82M$22M Series A 2022 + $60M round 2023; no valuation
Largest unit
100 MWhHolmes Western, Kern County; commercial since Sep 2025
EIB venture debt
€35Msigned Dec 2024; 3 EU units, conditional
Claimed efficiency
>97%electricity in to heat out; company claim, untested
Facts as of October 2026. Rondo is privately held, files no financial statements and has disclosed no valuation; its only SEC filing is a 2022 Form D. Its efficiency, standby-loss and design-life figures are company claims with no published independent test and no stated measurement boundary, and it has published no delivered heat price or operating data (hours, cycles, availability, energy delivered) for any unit. Figures are labelled as company claims, press reports or Blizzard Power arithmetic where they are one of those.

Overview

Rondo Energy builds electrically charged heat batteries for industrial plants. Resistive heaters warm stacks of refractory brick during cheap or surplus power hours, and air blown through the stack carries the heat out as superheated air or steam. The company was founded in 2020 by John O'Donnell and Pete von Behrens, both from concentrating solar thermal; Rondo's biography says O'Donnell co-founded GlassPoint Solar and, before that, Ausra. It is incorporated in Delaware as Rondo Energy, Inc. and uses an Alameda, California dateline on its releases.

Eric Trusiewicz has been chief executive since June 19, 2024, when O'Donnell wrote that Trusiewicz "has stepped up to lead Rondo Energy as CEO" and that he was moving to chief innovation officer. Rondo's biography says Trusiewicz joined as a strategic advisor in early 2021, after work as an entrepreneur in residence at Breakthrough Energy Ventures and more than a decade at a multinational cement company. Von Behrens is chief technology officer, Karim Ibrik chief operating officer and Tony Meneghetti chief financial officer. Rondo publishes no headcount and no board list.

The documented operating record is three units: a 2 MWh pilot at Calgren Renewable Fuels in California since 2023, a 100 MWh unit at a Holmes Western Oil Corp. site in Kern County whose commercial operation Rondo announced on October 16, 2025, and a 33 MWh unit at a Siam Cement Group (SCG) plant in Thailand that started in November 2025. One 100 MWh unit is under construction in Germany and two more are in development in Portugal and Denmark. Rondo's homepage says it has announced "11 commercial developments, including 8 RHB deployments"; no source located for this profile names eight units, and the company does not list them.

How the heat battery works

Rondo's product is the Rondo Heat Battery (RHB). Its how-it-works page describes "thousands of tons of brick" heated to as much as 1,500°C; the homepage gives a range of 1,100 to 1,500°C. Air flows up through the brick and leaves above 1,000°C, and the delivery rate is set by the air flow. Output options listed by Rondo are superheated air, superheated or saturated steam, and heated thermal oil. The battery itself discharges only heat. Where Rondo markets electric power, the steam drives a conventional steam turbine, as at the SCG unit, and its products page quotes "c. 4:1 ratio of heat:electricity delivery, case dependent" for that configuration.

Charging is meant to fit a short daily window. The homepage says 6 to 8 hours a day, the 2022 product launch said as little as 4 hours, and pv magazine USA quoted Rondo in October 2025 saying the Holmes Western unit charges "using only the six lowest-cost hours of electricity per day." The 2022 launch named two models, RHB100 and RHB300, without publishing specifications for either; the Thailand unit is an RHB33. Rondo's current product page says a single unit can be sized from 2 MWth to over 100 MWth. Latitude Media reported in December 2024 that Rondo enlarged its cast bricks from about 50 kg to cut labor, and that producing the larger bricks took about six months longer than expected.

Rondo quotes its efficiency several ways. The March 2023 Calgren release claimed "documented efficiency over 90%" for the pilot and said larger units store energy at over 98% efficiency. The October 2025 Holmes Western release claimed "round-trip efficiency above 97%." The products page says "97%+" and the homepage says 98%. Every one of these figures runs from electricity in to heat out; none is electricity to electricity. Rondo has not said whether the figures count fan and blower loads, steam generator losses or standby loss across a cycle, or over what period they were averaged, and no independent test report from a national laboratory or certification body could be located.

The other performance claims carry the same caveat. Rondo's how-it-works page gives standby loss of "less than 1% per day" and a "50-year life"; its homepage says "40+ year life." Neither life figure can be demonstrated yet, since the oldest unit began operating in 2023.

Deployments

Holmes Western Oil Corp., Kern County, California100 MWh · operating
Rondo announced the start of commercial operation on October 16, 2025, saying that "after 10 weeks of operation, the project has achieved all milestones for daily automatic operation, performance, efficiency, and reliability." Its case study page dates commercial operation to September 2025. The release says the unit is "powered exclusively by an on-site PV solar array" and does not give the array's size; Canary Media, pv magazine USA and POWER reported it as 20 MW. Rondo's headline calls the unit the world's largest industrial heat battery, which is the company's description.The unit makes steam that is injected into oil wells to raise production, a job previously done by a gas-fired boiler, according to Canary Media; Electrek reported that it runs alongside the site's gas-fired boilers. Rondo's release rates its heat batteries for steam at 100+ bar in general and gives no pressure for this unit. O'Donnell told Canary Media that Holmes Western owns the unit, bought "at a price point that was economical to them," and Canary reported that it avoids about 13,000 tonnes of CO2 a year, a company-derived figure. The price, discharge rating in MWth and any measured output are unpublished. O'Donnell told Latitude Media the unit validated "our computational models at 100 MWh scale" and cut labor hours per MWh by at least 60% against the Calgren pilot.
SCG cement plant, Saraburi Province, Thailand33 MWh / 2.3 MWth · operating
Rondo and SCG announced in November 2025 that an RHB33 unit was operating at an SCG cement plant, charged from the grid and a nearby floating solar farm, with superheated steam driving a steam turbine. They said it was built in eight months, mostly with local suppliers. At the stated 2.3 MWth of continuous steam, 33 MWh would last about 14 hours at full output, which is arithmetic on the two published ratings. SCG's May 2026 page on the unit describes efficiency of up to 97%, another company figure.
Calgren Renewable Fuels, Pixley, California2 MWh · operating since 2023
Rondo's first commercial unit, a 2 MWh pilot sold under a heat-as-a-service arrangement, entered commercial operation in March 2023 after a 200 kWh prototype. Latitude Media reported in December 2024 that Rondo had pitched about 600 MWh to meet all of Calgren's heat and power needs before the two agreed on 2 MWh; no follow-up has been located.
Covestro, Brunsbüttel, Germany100 MWh · under construction
Ground was broken on January 19, 2026 for an RHB100 that Covestro says will supply about 10% of the site's steam and save up to 13,000 tonnes of CO2 a year, with start-up targeted for the end of 2026.
Central de Cervejas (Heineken), Vialonga, Portugal100 MWh · in development
Announced on November 3, 2025. Rondo supplies the battery, EDP supplies an on-site solar plant and grid power, and EDP sells the steam to the brewery under a heat-as-a-service contract; Eurelectric described the project as pre-final investment decision. Rondo's release says the battery "will provide 7 MWs of steam for brewing processes," and trade coverage gives a go-live date of April 2027. Eurelectric's case study puts the saving at 6,600 tonnes of CO2 a year.
GreenLab, Skive, Denmark100 MWh · in development, no date
Announced in June 2024 as a 100 MWh unit charged from GreenLab's existing 84 MW solar and wind park; Invest in Denmark said in September 2024 that it was set to begin operating in 2025. Rondo's customer page, checked October 9, 2026, describes it as driving a combined heat and power steam turbine for several companies in the park and gives no operating date. No revised date could be located.
AramcoMOU · May 17, 2024
A memorandum of understanding with Saudi Aramcocovers engineering studies for a first industrial-scale deployment "with subsequent scale up to 1GWh"; the release headline calls it GW-scale. An MOU is not a purchase commitment, and no site, contract or investment decision had been announced as of October 2026.

Two US federal awards that named Rondo as heat battery supplier were cancelled. In both cases the Department of Energy recipient was the customer, not Rondo. Diageo was selected in March 2024 for up to $75 million under the Industrial Demonstrations Program for distilleries in Shelbyville, Kentucky and Plainfield, Illinois; the award was executed on December 16, 2024, and the USAspending mirror HigherGov shows obligations of $142,735 ending May 29, 2025. Eastman Chemical's $375 million award for its Longview, Texas molecular recycling plant, which Eastman said would use Rondo batteries, was executed on September 12, 2024. Both appear on the list of 24 terminated awards DOE announced on May 30, 2025. Rondo told pv magazine in October 2025 that it was "still in discussions" with Diageo.

Funding & investors

Rondo has announced two equity rounds with amounts. The $22 million Series A, announced on February 8, 2022, was led by Breakthrough Energy Ventures and Energy Impact Partners. On August 16, 2023 Rondo said it had "raised $60 million in a new financing"; the release gives no series letter. Existing investors Breakthrough Energy Ventures, Energy Impact Partners, SCG and TITAN Cement Group took part, joined by Microsoft's Climate Innovation Fund, Rio Tinto, SABIC, Aramco Ventures, SDCL Energy Efficiency Income Trust (SEEIT) and John Doerr. Six of the strategic investors joined a Strategic Investor Advisory Board. The two announced rounds add to $82 million, the figure Heatmap also reported as raised to date.

Several strategic checks came without amounts. TITAN joined the Series A in 2022 and said in July 2023 that it had expanded its investment. SCG invested in September 2022 under a letter of intent to develop and expand use of the technology. H&M Group Ventures invested in June 2024, which FashionUnited reported was its first investment in decarbonization technology. Axios reported in June 2024 that Trusiewicz said Rondo was preparing to raise more than $100 million. No valuation has been disclosed by Rondo or any investor.

The only SEC filing is a Form D filed on June 17, 2022, reporting $25,116,635 of equity sold to 7 investors, with first sale on January 4, 2022. No source explains the gap with the announced $22 million. No Form D exists for the 2023 round; the absence of a filing does not by itself show how much was raised. Rondo's homepage says it has announced "more than $160 million in funding" without a breakdown. The two equity rounds plus the €75 million European package below come to roughly that, but that reconciliation is Blizzard Power's inference, and the package is conditional project finance rather than corporate equity.

The European package was announced on June 26, 2024 as €75 million of "grants and venture debt, subject to funding conditions," from Breakthrough Energy Catalyst and the European Investment Bank under the EU-Catalyst Partnership, backed by InvestEU. The EIB's project page (reference 20230665) shows €35 million of EIB financing to Rondo Energy Inc. against a total project cost of €78 million, covering three 100 MWh RHB100 units in Germany, Denmark and Portugal; it was approved on June 24, 2024 and signed on December 11, 2024. Neither Rondo nor the EIB states the Catalyst grant amount. Subtracting the EIB loan from the €75 million total gives €40 million, which is arithmetic. How much of either has been drawn is not public.

SCG is also Rondo's manufacturing partner. In June 2023 the companies said an SCG facility in Thailand had 2.4 GWh a year of heat battery production capacity and would be expanded to 90 GWh a year; a spokesperson told Electrek the expansion would come over the next few years, with no date. MIT Technology Review repeated the 2.4 GWh figure in October 2025. Sources differ on whether the Thai plant makes brick material or complete units, and no source shows capacity above 2.4 GWh a year built or reports actual output. No Rondo manufacturing site in the United States could be located.

Market & competition

A heat battery competes with a gas boiler on the price of the energy that charges it. US industrial customers paid an average of 9.77 cents per kWh for electricity in July 2026, per EIA's Electric Power Monthly Table 5.3 released September 24, 2026, and $4.58 per thousand cubic feet for natural gas, per EIA series N3035US3 released September 30, 2026; EIA flags the 2025 and 2026 electricity figures as preliminary. At 3,412 Btu per kWh and about 1,037 Btu per cubic foot, that is roughly $28.60 per MMBtu for electricity against $4.42 for gas, a ratio of about 6.5 to 1. On 2025 annual averages (8.62 cents and $5.23) the ratio is about 5 to 1.

Allowing for an 85% efficient gas boiler and taking Rondo's claimed 98% at face value, the battery matches July 2026 gas heat on energy cost alone when charging power costs about $17 per MWh, or about $20 per MWh at 2025 gas prices, before any capital cost. These conversions are Blizzard Power arithmetic on the EIA series. On these numbers, a heat battery charged at average industrial tariffs does not compete with gas on fuel cost, which is consistent with Rondo's first full-scale unit running on its own off-grid solar and with its pitch to charge in the cheapest hours of the day.

Rondo has published no delivered heat price. The one number on record is a target: Canary Media reported in October 2025 that O'Donnell said Rondo is targeting $30 per megawatt-hour for the energy storage services its heat batteries provide, and that the Holmes Western project is "not close" to that price. Whether the target includes the electricity is not stated. In an October 2022 presentation to the California Air Resources Board, Rondo put electric thermal storage at 1.5 times the cost of natural gas before Inflation Reduction Act credits and 0.8 times after, without giving absolute prices or naming the credits.

Outside studies come with sponsors. Brattle's October 2023 study for C2ES and the Renewable Thermal Collaborative, a coalition of industrial heat buyers, found that "thermal batteries can be cost-competitive with natural gas in much of the US even today, though the strength of the business case depends on the configuration of electricity supply, location, access to wholesale power prices, any greenhouse gas (GHG) price that may be applied, and eligibility for policy support." Brattle's June 2024 presentation of the study used a gas benchmark of $6 per MMBtu, above the July 2026 industrial price. Jeff Rissman of the policy think tank Energy Innovation put thermal battery heat at $35 to $62 per MWh-thermal in the locations Energy Innovation studied, in a September 2023 interview with Thermal Processing; the electricity price behind that range was not located.

US tax treatment is unsettled. Section 48(c)(6) of the Internal Revenue Code defines thermal energy storage around building heating and cooling, so a unit that sells only process steam does not obviously qualify for the Section 48E storage credit; one that feeds a steam turbine may fit the branch for storage that delivers energy "for conversion to electricity." Section 45X sets a $45 per kWh credit for battery modules that do not use cells, and the final rules, as summarized by Mayer Brown, include thermal batteries in that category, but the credit applies to US production, and Rondo's stated capacity is in Thailand. Both readings are inference from the statute and law-firm summaries; no IRS guidance on industrial process-heat storage under Section 48E, and no claim of either credit by Rondo or a customer, could be located.

Under the EU Emissions Trading System, the 13,000 tonnes a year Covestro expects to save would be worth about €1.07 million a year at the €82.40 per tonne EU allowance price reported on October 5, 2026, a gross figure that ignores Covestro's free allocation, which is not public at site level.

Most competitors are private. Antora Energystores heat in carbon blocks and can discharge power through thermophotovoltaic cells; it closed a $550 million Series C in July 2026, began commissioning a 5 GWh system at POET's Big Stone City, South Dakota ethanol plant in May 2026, and on October 1, 2026 announced a 5.8 GWh "multi-day thermal energy storage project" at Pratt Energy's biorefinery in Kansas, with no power rating, timeline or cost given. Electrified Thermal Solutions, an MIT spinout using conductive firebrick, said in September 2026 that two Joule Hive units, 20 MWh initially, are to be deployed for Holcim, and that its first commercial-scale unit at Southwest Research Institute has logged more than 1,000 hours.

In Europe, Kraftblock's 20 MWh unit at Tata Steel's Jamshedpur works, which stores waste heat at about 500°C, was commissioned in May 2025, and Kyoto Group inaugurated a 56 MWh molten salt Heatcube at KALL Ingredients in Hungary in October 2025 under a 15-year heat-as-a-service contract. Brenmiller Energy, renamed BrenX Ltd. in July 2026, reported no revenue in the first half of 2026 and disclosed substantial doubt about its ability to continue as a going concern. By energy capacity, Holmes Western is nearly twice Kyoto's unit and one-fiftieth of Antora's Big Stone system.

Key considerations

Rondo has published no operating data for any of its three running units: no operating hours, cycle counts, availability, energy charged or delivered, steam tonnage, measured efficiency or measured standby loss. Calgren has run since 2023 and Holmes Western since about August 2025. Until those numbers appear, the 97% to 98% efficiency figures, the less-than-1% daily standby loss and the 40- or 50-year life rest on Rondo's own statements.

The full-scale reference unit sits on an oil field with its own solar array and no grid charging. The European units are Rondo's first 100 MWh systems in chemicals, brewing and an industrial park, and the Heineken unit charges partly from the grid, which puts tariffs back into the economics. Covestro's end-2026 start-up is the next public test. GreenLab has already missed its 2025 date.

The capital record stops in 2023. Rondo has announced no equity round since the $60 million in August 2023, and the raise of more than $100 million that Trusiewicz told Axios in June 2024 Rondo was preparing has not been announced. The €35 million EIB loan and the Catalyst grant are conditional and tied to three named projects. Rondo's headline counts (11 developments, 8 deployments, more than 400 MWh of announced projects and 3 GWh of partnerships on its homepage) carry no project list behind them, and the largest commercial prospect, Aramco, is an MOU.

Production capacity is 2.4 GWh a year at a partner's plant in Thailand, and the 90 GWh expansion has no date. Whether US buyers can claim Section 48E for heat-only units, and whether any Rondo hardware could earn Section 45X without US production, are unresolved on the public record.

Sources

This profile was compiled from publicly available information including:

Rondo Energy, Holmes Western commercial operation release (PR Newswire, October 16, 2025), with the Holmes Western case study; Canary Media (October 22, 2025) on enhanced oil recovery, ownership, CO2 and the $30/MWh target; pv magazine USA (October 17, 2025); Electrek (October 16, 2025); Latitude Media (October 21, 2025) and its brick report (December 12, 2024).

Rondo pages accessed October 9, 2026: homepage, how it works, products, customers and leadership; CEO transition (June 19, 2024); product launch (November 16, 2022); Calgren release (March 2023); Thailand release (November 13, 2025) and the SCG Cleanergy page (May 13, 2026); Covestro groundbreaking (January 2026) and Covestro's release; EDP and Heineken release (November 3, 2025), ESG Dive (November 5, 2025) and Eurelectric (June 3, 2026); Invest in Denmark on GreenLab (June 2024); Aramco MOU (May 17, 2024).

Funding: SEC Form D, Rondo Energy, Inc., CIK 1934222 (filed June 17, 2022); Series A release (February 8, 2022); $60 million release (August 16, 2023); SCG investment release (September 28, 2022); TITAN release (July 20, 2023); FashionUnited on H&M Group Ventures (June 21, 2024); Axios Pro on the planned raise (June 26, 2024); Heatmap on the $82 million total (January 25, 2024); EIB project 20230665, EIB release (June 26, 2024) and Rondo's €75 million release; pv magazine and Electrek (June 27, 2023) and MIT Technology Review (October 1, 2024 and October 23, 2025) on the Thailand factory.

Federal awards: DOE termination of 24 projects (May 30, 2025) and the terminated-awards list published by NOTUS; Diageo's selection release (March 2024); HigherGov, award DE-CD0000102; Eastman's release via CSRwire (2024).

Economics and policy: EIA Electric Power Monthly, Table 5.3 (released September 24, 2026); EIA natural gas industrial price, N3035US3 and annual table (released September 30, 2026); Rondo's CARB SB 596 workshop presentation (October 2022); Brattle for C2ES and the Renewable Thermal Collaborative (October 2023) and its June 2024 ESIG presentation; Thermal Processing Q&A with Jeff Rissman (September 15, 2023); 26 U.S. Code § 48 and § 45X, Cornell LII; Mayer Brown on the final 45X regulations(November 6, 2024); S&P Global Commodity Insights on EU allowance prices (October 5, 2026).

Competitors: ESS News (October 1, 2026) and KWCH (October 7, 2026) on Antora's Kansas project; Electrified Thermal Solutions' Holcim release (September 15, 2026); Tata Steel on Kraftblock at Jamshedpur (2026); Kyoto Group's KALL Ingredients release (October 9, 2025); BrenX Ltd. interim report filed on Form 6-K (six months to June 30, 2026).

Note on sourcing: Business Wire, Energy-Storage.news and the Axios Pro story returned errors to automated retrieval, so items from them rest on headlines, reprints or other outlets' coverage. Rondo's headcount, board, valuation, the H&M and SEEIT investment amounts, the Holmes Western price and any measured operating data are not public and are not estimated here.

This profile is for informational purposes only and does not constitute investment advice, a recommendation, or a solicitation to buy or sell any security. Rondo Energy is a private company; information is limited to publicly disclosed sources, and its performance figures are company claims unless otherwise attributed.